NO-TILL RENOVATION VS. CONVENTIONAL RECONSTRUCTION
•No-till TifEagle can save you up to 75% of the cost of conventional greens reconstruction.Complete rebuild-costs range from $1.50 to $4.00 per sq. ft. versus .45 to .80 per sq. ft. for no-till • Six to eight weeks is normal turnaround for no-till versus 10 to 18 weeks for a complete rebuild. Reduced down-time greatly reduces lost revenue • Site prep can be done with your own crews and equipment to fit your own schedule •Original putting surface grades and contours are maintained • Healthy mature seedbed is retained and serves as base for new putting surface • You get a speedy conversion from poor quality greens to TifEagle, the ultimate ultradwarf putting surface.